| Date of Award | 25 Jun 2013 |
|---|---|
| Original language | Hebrew |
| Awarding Institution |
|
| Supervisor | Yael Perlman (Supervisor) |
Loadncing and Preventive Maintenance Scheduling in Semiconductor Manufacturning
Student thesis: MA Thesis