TY - JOUR
T1 - Time-dependent multi-scheduling of multicast
AU - Cohen, Rami
AU - Rawitz, Dror
AU - Raz, Danny
PY - 2009/12/1
Y1 - 2009/12/1
N2 - Many network applications that need to distribute content and data to a large number of clients use a hybrid scheme in which one (or more) multicast channel is used in parallel to a unicast dissemination. This way the application can distribute data using one of its available multicast channels or by sending one or more unicast transmissions. In such a model the utilization of the multicast channels is critical for the overall performance of the system. We study the scheduling algorithm of the sender in such a model. We describe this scheduling problem as an optimization problem where the objective is to maximize the utilization of the multicast channel. Our model captures the fact that it may be beneficial to multicast an object more than once (e.g., page update). Thus, the benefit depends, among other things, on the last time the object was sent, which makes the problem much more complex than previous related scheduling problems. We show that our problem is NP-hard. Then, using the local ratio technique we obtain a 4-approximation algorithm for the case where the objects are of fixed size and a 10-approximation algorithm for the general case. We also consider a special case which may be of practical interest, and prove that a simple greedy algorithm is a 3-approximation algorithm in this case.
AB - Many network applications that need to distribute content and data to a large number of clients use a hybrid scheme in which one (or more) multicast channel is used in parallel to a unicast dissemination. This way the application can distribute data using one of its available multicast channels or by sending one or more unicast transmissions. In such a model the utilization of the multicast channels is critical for the overall performance of the system. We study the scheduling algorithm of the sender in such a model. We describe this scheduling problem as an optimization problem where the objective is to maximize the utilization of the multicast channel. Our model captures the fact that it may be beneficial to multicast an object more than once (e.g., page update). Thus, the benefit depends, among other things, on the last time the object was sent, which makes the problem much more complex than previous related scheduling problems. We show that our problem is NP-hard. Then, using the local ratio technique we obtain a 4-approximation algorithm for the case where the objects are of fixed size and a 10-approximation algorithm for the general case. We also consider a special case which may be of practical interest, and prove that a simple greedy algorithm is a 3-approximation algorithm in this case.
KW - Approximation algorithms
KW - Local ratio
KW - Multicast
KW - Scheduling
UR - http://www.scopus.com/inward/record.url?scp=74049140746&partnerID=8YFLogxK
U2 - 10.1145/1644015.1644029
DO - 10.1145/1644015.1644029
M3 - ???researchoutput.researchoutputtypes.contributiontojournal.article???
AN - SCOPUS:74049140746
SN - 1549-6325
VL - 6
JO - ACM Transactions on Algorithms
JF - ACM Transactions on Algorithms
IS - 1
M1 - 14
ER -