Abstract
This paper deals with the stochastic multimode resource constrained project scheduling problem (MRCPSP). Stochasticity is manifested by uncertain activity durations. The objective is to find a minimal duration robust project plan that determines activity modes and schedules. Robustness ensures that the plan is feasible for any activity duration realization within an uncertainty set. We formulate the robust MRCPSP and develop an analytical solution approach.
| Original language | English |
|---|---|
| Title of host publication | 2018 IEEE Technology and Engineering Management Conference, TEMSCON 2018 |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| ISBN (Electronic) | 9781538620472 |
| DOIs | |
| State | Published - 9 Oct 2018 |
| Externally published | Yes |
| Event | 2018 IEEE Technology and Engineering Management Conference, TEMSCON 2018 - Evanston, United States Duration: 28 Jun 2018 → 1 Jul 2018 |
Publication series
| Name | 2018 IEEE Technology and Engineering Management Conference, TEMSCON 2018 |
|---|
Conference
| Conference | 2018 IEEE Technology and Engineering Management Conference, TEMSCON 2018 |
|---|---|
| Country/Territory | United States |
| City | Evanston |
| Period | 28/06/18 → 1/07/18 |
Bibliographical note
Publisher Copyright:© 2018 IEEE.
Keywords
- Multi-mode
- Resource constraints
- Robust optimization
- Scheduling