Abstract
This paper analyzes a manufacturing system consisting of parallel machines, which produce one product-type with controllable production rates subject to continuously-divisible, time-dependent resources. The objective is to produce the required amount of product-type units by a due date while minimizing inventory, backlog and production related costs over a production horizon. With the aid of the maximum principle, a number of analytical rules of the optimal scheduling is derived whereby the continuous-time scheduling is reduced to discrete sequencing and timing. As a result, a polynomial-time algorithm is developed for solving the problem.
| Original language | English |
|---|---|
| Pages (from-to) | 771-787 |
| Number of pages | 17 |
| Journal | European Journal of Operational Research |
| Volume | 170 |
| Issue number | 3 |
| DOIs | |
| State | Published - 1 May 2006 |
Keywords
- Constrained resources
- Scheduling
- Systems dynamics
Fingerprint
Dive into the research topics of 'Optimal scheduling of parallel machines with constrained resources'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver