Abstract
The paper analyzes a manufacturing system with tandem machines producing one part type. The system is periodically stopped for maintenance. The objective is to determine machine production rates so that the inventory and backlog-related expenses could be minimized. We show only a few so-called restricting machines need to be considered. A numerical example is used to demonstrate the solution approach proposed in the paper.
Original language | American English |
---|---|
Pages (from-to) | 363-374 |
Journal | IIE Transactions |
Volume | 34 |
Issue number | 4 |
State | Published - 2002 |