Abstract
We study a problem of scheduling a set of n jobs with unit processing times on a set of m multipurpose machines in which the objective is to minimize the makespan. It is assumed that there are two different job types, where each job type can be processed on a unique subset of machines. We provide an optimal offline algorithm to solve the problem in constant time and an online algorithm with a competitive ratio that equals the lower bound. We show that the worst competitive ratio is obtained for an inclusive job-machine structure in which the first job type can be processed on any of the m machines while the second job type can be processed only on a subset of m/2 machines. Moreover, we show that our online algorithm is 1-competitive if the machines are not flexible, i.e., each machine can process only a single job type.
| Original language | American English |
|---|---|
| State | Published - 2011 |
| Event | Annual Conference of Operational Research Society of Israel (ORSIS) - Akko, Israel Duration: 29 May 2011 → 30 May 2011 |
Conference
| Conference | Annual Conference of Operational Research Society of Israel (ORSIS) |
|---|---|
| Country/Territory | Israel |
| City | Akko |
| Period | 29/05/11 → 30/05/11 |
Fingerprint
Dive into the research topics of 'Online Scheduling of Two Job Types on a Set of Multipurpose Machines with Unit Processing Times'. Together they form a unique fingerprint.Activities
- 1 Organizing a conference, workshop, ...
-
Annual Conference of Operational Research Society of Israel (ORSIS)
Karhi, S. (Participation - Conference participant)
29 May 2011 → 30 May 2011Activity: Participating in or organizing an event › Organizing a conference, workshop, ...
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver