Abstract
The paper proposes an algorithm for generating optimal cyclic schedules of hoist moves in a printed circuit board electroplating facility where transportation of parts between workstations is performed by a computer-controlled hoist. The objective of the scheduling problem is to maximize the throughput rate. Unlike many previous algorithms which consider 1-part cyclic schedules, the proposed algorithm provides an exact solution for the more complicated case of r-part cyclic schedules where r>1. The algorithm is illustrated with numerical examples comparing 1-part and multiple-part optimal schedules.
| Original language | English |
|---|---|
| Pages (from-to) | 704-713 |
| Number of pages | 10 |
| Journal | IEEE Transactions on Robotics and Automation |
| Volume | 15 |
| Issue number | 4 |
| DOIs | |
| State | Published - 1999 |
| Externally published | Yes |
Fingerprint
Dive into the research topics of 'Multiple-part cyclic hoist scheduling using a sieve method'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver